How to Avoid Ordering Short on a Concrete Pour Today

Ordering short on a ready-mix pour is expensive twice over: a short-load fee for the first truck being under the supplier's minimum, and often another short-load fee for the emergency second truck. Here's how to get the order right the first time.

Start with exact dimensions, not estimates

"About 10 by 10" isn't precise enough — measure to the nearest inch, especially thickness, since a half-inch difference in thickness across a large slab adds up to a meaningful volume difference.

Always add a waste buffer

5–10% on top of your raw calculated volume covers spillage, subgrade irregularity, and formwork imperfection. Skipping this is the single most common cause of a short pour.

Round up to your supplier's increment

Most suppliers deliver in quarter-yard or half-yard increments. If your buffered calculation lands at 4.6 yards, order 4.75, not 4.5.

Ask about the minimum order before you calculate

Many suppliers charge a short-load fee under 3–4 cubic yards. If your project is close to that threshold, it's often worth combining it with another small pour (a footing, a post) to clear the minimum in one trip rather than paying the fee twice.

Run your numbers through the Concrete Calculator or the Square Footage Calculator before you call your supplier — both add the waste buffer automatically so the number you give them is the number you should actually order.

Related Calculators

Concrete Calculator

All-in-one estimator

301K/mo searches

Yardage Calculator

Cubic yard converter

5.4K/mo searches

Square Footage Calculator

Area to volume & cost

1.5K/mo searches