Fence Runs

Fence Post Concrete Calculator

Enter your fence length and post spacing to get total post count and concrete needed for the whole run.

The Fence Post Calculator helps you figure out exactly how much material to buy before you order a truck or make a hardware store run. Enter your fence length and post spacing to get total post count and concrete needed for the whole run. Instead of guessing at cubic yards or bag counts and hoping it's close, you enter the numbers you already have — the measurements from your plan, tape measure, or job site — and get a precise, ready-to-order figure back in seconds.

This tool is built for two kinds of people: contractors running a fast takeoff between jobs who need a number they can call into a supplier immediately, and homeowners or first-time DIYers who don't want to either overspend on wasted material or come up short mid-pour. Every calculator on ConcreteYard uses the same standard, industry-typical assumptions — 150 lb per cubic foot for normal-weight concrete, standard bag yields, and common mix ratios — so the numbers here should line up closely with what your supplier or hardware store confirms when you place the order.

Whether you're pricing out a job, planning a delivery, or just want to know how much to buy at the store today, this calculator gives you a number you can act on immediately — no spreadsheet, no account, and no guesswork required.

Fence Run

Post count includes both ends of the run. Depth should sit below your local frost line.

Calculated
Fence TicketCC-000000-000
Posts Needed0
Concrete per Hole0 cu ft
Total Volume0 cu ft
Bags to Buy0.00 yd³
Subtract post volume for a slightly tighter number, or leave as-is for a safe buffer \u2014 posts displace only a small fraction of hole volume.

How to Use the Fence Post Calculator

1. Measure accurately. Get exact dimensions in the units the calculator asks for — feet for length and width, inches for thickness are the most common setup. A rough guess in, a rough number out; precise measurements are what make this tool worth using over a mental estimate.

2. Enter your numbers. Fill in the fields above with your project's actual measurements. Default values are pre-filled as a sane starting point — replace every one of them with your real numbers before you rely on the result.

3. Adjust the settings. Where available, set your waste percentage, bag size, or price per yard to match your job. These small adjustments are what separate a rough ballpark from an order-ready figure.

4. Read the batch ticket. Click calculate and use the highlighted total as your order quantity — it already accounts for waste and rounds to a practical ordering increment where relevant.

Post Spacing Guide

Fence TypeTypical Spacing
Wood privacy fence6\u20138 ft
Chain link8\u201310 ft
Split rail8\u201310 ft

Hole Size Rule of Thumb

A hole diameter about 3 times the post's width, set to a depth below the frost line (or 1/3 the post's above-ground height, whichever is greater), is the common contractor rule for stable fence posts.

Frequently Asked Questions

How much concrete do I need per fence post?

For a 10 in diameter hole, 2 ft deep, plan on about 1.1 cubic feet of concrete per post \u2014 roughly one 50 lb bag. This calculator totals that across your whole fence run.

How many fence posts do I need for 100 feet?

At 8 ft spacing, a 100 ft fence run needs about 13 posts (100 \u00f7 8, rounded up, plus one for the starting post). Adjust spacing above for your fence style.

Common Estimating Mistakes to Avoid

Skipping the waste factor. Uneven subgrade, formwork gaps, and simple spillage routinely eat 5–10% of your raw calculated volume. Ordering the exact math-perfect number is one of the most common ways to come up short mid-pour.

Rounding down instead of up. Ready-mix trucks deliver in fractions of a yard, but suppliers set order minimums. If your number lands at 4.1 yards, round to 4.25 or 4.5, not down to 4.

Mixing up units. Thickness is almost always in inches while length and width are in feet — plugging inches into a feet field (or vice versa) is the single most common calculator input error.

Treating irregular shapes as one rectangle. An L-shaped or curved area isn't one simple calculation. Break it into rectangles, run each section separately, and add the totals together for an accurate figure.

Tips for a Successful Pour

Order slightly more than the bare minimum — a short-load fee for a second truck almost always costs more than the extra material would have. Confirm your supplier's order minimum and short-load fee before you finalize a quantity that's close to the cutoff.

Check the weather. Concrete needs temperatures generally above 40°F to cure properly without special cold-weather additives, and pouring in direct heat or high wind can cause the surface to dry and crack before it has a chance to properly set.

Have everything staged before the truck arrives — forms set, base compacted, tools (screed board, bull float, edger) on site, and enough hands to place and finish the pour before it starts to set.

Plan your control joints in advance for any flatwork. Joints control where concrete cracks as it cures and shrinks — skipping them doesn't prevent cracking, it just makes the cracks unpredictable.

More Questions

Is this calculator accurate?

Yes — it uses standard, industry-typical formulas and material assumptions (150 lb/cu ft concrete, standard bag yields, common mix ratios). For structural or permitted work, always confirm final quantities with your supplier or engineer.

Do I need to create an account to use this?

No. Every calculator on ConcreteYard runs entirely in your browser, works instantly, and requires no sign-up, login, or download.

Can I use this calculator on my phone at the job site?

Yes — every tool on this site is built to work the same on a phone as it does on a desktop, so you can run the numbers standing at the job site before you call in an order.

More Concrete Calculators

Every tool below shares the same 150 lb/cu ft mix assumption, so figures stay consistent across your takeoff.

Concrete Calculator

All-in-one estimator

301K/mo searches

Bag Calculator

Bag count & cost

6.6K/mo searches

Cylinder & Post Calculator

Columns, posts, sonotubes

1.3K/mo searches

Post Hole Calculator

Single post hole volume

940/mo searches